Community contract

Community contract draft

This contract is a draft. We want local residents to read it, question it, and propose changes before any final version is considered.

A draft open to the community

It is not presented as a final contract or an obligation to sign. We are seeking community input on its terms, protections, obligations, and benefits.

Request access to the draft

Before opening the download, enter your name and address. This information will be sent to the project contact to record the request.

Download the updated English community agreement

The updated draft for counsel review is available from UK connections. The download now recognises common VPN, CDN and reverse-proxy headers, with a fallback if the geolocation service itself is temporarily unavailable. Downloading it does not oblige you to sign.

Download English contract (.pdf)

If the server positively identifies the connection as outside the UK, the download is blocked; a temporary geolocation-service failure no longer blocks a UK user.

River-community schedule

River communityCurrent populationMain riverCommunity contextIT capacity at 4.46 kW/person
Falstone215 (2021 Census)North TyneRural village0.96 MW
Bellingham1,255 (2021 Census)North TyneService village5.60 MW
Wark719 (2021 Census)North TyneRiverside village3.21 MW
Barrasford788 (2021 Census) (Chollerton parish)North TyneRiverside village3.51 MW
Chollerford711 (2021 Census) (Humshaugh parish)North TyneRiver crossing3.17 MW
Haydon Bridge2,374 (2021 Census) (Haydon parish)South TyneRail-linked village10.59 MW
Hexham11,346 (2021 Census)TyneMarket town / rail hub50.60 MW
Corbridge3,558 (2021 Census)TyneTown / rail link15.87 MW
Total20,966 residentsThree main river reaches8 communities / 8 proposed nodes93.51 MW IT

The downloadable draft is revised for these eight river-community areas. The V6 capacity schedule uses the latest official 2021 Census parish/town-council population available for each active community and applies 4.46 kW of IT capacity per resident. Chollerford uses Humshaugh parish, Barrasford uses Chollerton parish and Haydon Bridge uses Haydon parish. Hexham and Corbridge are proposed data-centre communities as well as transport/retail links.