This contract is a draft. We want local residents to read it, question it, and propose changes before any final version is considered.
It is not presented as a final contract or an obligation to sign. We are seeking community input on its terms, protections, obligations, and benefits.
Before opening the download, enter your name and address. This information will be sent to the project contact to record the request.
The updated draft for counsel review is available from UK connections. The download now recognises common VPN, CDN and reverse-proxy headers, with a fallback if the geolocation service itself is temporarily unavailable. Downloading it does not oblige you to sign.
Download English contract (.pdf)If the server positively identifies the connection as outside the UK, the download is blocked; a temporary geolocation-service failure no longer blocks a UK user.
| River community | Current population | Main river | Community context | IT capacity at 4.46 kW/person |
|---|---|---|---|---|
| Falstone | 215 (2021 Census) | North Tyne | Rural village | 0.96 MW |
| Bellingham | 1,255 (2021 Census) | North Tyne | Service village | 5.60 MW |
| Wark | 719 (2021 Census) | North Tyne | Riverside village | 3.21 MW |
| Barrasford | 788 (2021 Census) (Chollerton parish) | North Tyne | Riverside village | 3.51 MW |
| Chollerford | 711 (2021 Census) (Humshaugh parish) | North Tyne | River crossing | 3.17 MW |
| Haydon Bridge | 2,374 (2021 Census) (Haydon parish) | South Tyne | Rail-linked village | 10.59 MW |
| Hexham | 11,346 (2021 Census) | Tyne | Market town / rail hub | 50.60 MW |
| Corbridge | 3,558 (2021 Census) | Tyne | Town / rail link | 15.87 MW |
| Total | 20,966 residents | Three main river reaches | 8 communities / 8 proposed nodes | 93.51 MW IT |
The downloadable draft is revised for these eight river-community areas. The V6 capacity schedule uses the latest official 2021 Census parish/town-council population available for each active community and applies 4.46 kW of IT capacity per resident. Chollerford uses Humshaugh parish, Barrasford uses Chollerton parish and Haydon Bridge uses Haydon parish. Hexham and Corbridge are proposed data-centre communities as well as transport/retail links.